# How to do Trellis/Facet/Small Multiple in Kibana Lens with a pie chart

**URL:** <https://discuss.elastic.co/t/how-to-do-trellis-facet-small-multiple-in-kibana-lens-with-a-pie-chart/364872>\
**Category:** Kibana\
**Tags:** lens\
**Created:** [August 13, 2024, 10:32pm UTC](https://discuss.elastic.co/t/how-to-do-trellis-facet-small-multiple-in-kibana-lens-with-a-pie-chart/364872 "2024-08-13T22:32:55Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![binarysamurais](https://sea2.discourse-cdn.com/elastic/user_avatar/discuss.elastic.co/binarysamurais/32/136766_2.png) [@binarysamurais](https://discuss.elastic.co/u/binarysamurais)\
**Post date:** [August 13, 2024, 10:32pm UTC](https://discuss.elastic.co/t/how-to-do-trellis-facet-small-multiple-in-kibana-lens-with-a-pie-chart/364872/1 "2024-08-13T22:32:55Z")

</div>

I have a pie chart that I would like to show the percentage between two metrics Blocked & Not Blocked but I would like to Trellis/Fact/Small Multiple this pie chart by Category/Mitre Tactic (Reconnaissance, Resource Development, Initial Access, Execution, Persistence, Discovery, etc). I have not found any documentation on how to do this and google searches on the subject reference 2 year old github request [[Lens] Support small multiples / facet / trellis for XY and Partition charts · Issue #72063 · elastic/kibana · GitHub](https://github.com/elastic/kibana/issues/72063) that is still open.

Can this be done? Is this still an open feature request?

---

<div class="post-metadata">

**Author:** ![Marco\_Liberati](https://sea2.discourse-cdn.com/elastic/user_avatar/discuss.elastic.co/marco_liberati/32/82953_2.png) [@Marco\_Liberati](https://discuss.elastic.co/u/Marco_Liberati)\
**Post date:** [August 20, 2024, 7:44am UTC](https://discuss.elastic.co/t/how-to-do-trellis-facet-small-multiple-in-kibana-lens-with-a-pie-chart/364872/2 "2024-08-20T07:44:08Z")

</div>

Hi @binarysamurais

small multiples is not something that is currently available for pie charts (and some other chart types).  
If you have only a percentage and 2 categories, have you tried a Metric chart? With that you should be able to break down by Mitre tactic
