# Logstash upgrade dilemma?!

**URL:** <https://discuss.elastic.co/t/logstash-upgrade-dilemma/182589>\
**Category:** Logstash\
**Created:** [May 24, 2019, 8:38am UTC](https://discuss.elastic.co/t/logstash-upgrade-dilemma/182589 "2019-05-24T08:38:02Z")\
**Posts on this page:** 4\
**Page:** 1

<div class="post-metadata">

**Author:** ![agiorgi](https://avatars.discourse-cdn.com/v4/letter/a/e274bd/32.png) [@agiorgi](https://discuss.elastic.co/u/agiorgi)\
**Post date:** [May 24, 2019, 8:38am UTC](https://discuss.elastic.co/t/logstash-upgrade-dilemma/182589/1 "2019-05-24T08:38:02Z")

</div>

Hello there!

I'd like to update my ELK stack to version 7.1.  
Still, i don't understand whether i have to turn off beats, forwarders etc.. When upgrading logstash.

Assuming that i have _6 instances of logstash_ , behind a load balancer, and that there are no issues about the template i'm using, and that any of the breaking changes wouldn't affect my pipeline.

Will upgrading the 6 logstash nodes _one at a time_ , without shutting down the entire pipeline, work?  
If not, why?

Thanks in advance!  
Alessandro

---

<div class="post-metadata">

**Author:** ![pastechecker](https://avatars.discourse-cdn.com/v4/letter/p/0ea827/32.png) [@pastechecker](https://discuss.elastic.co/u/pastechecker)\
**Post date:** [May 24, 2019, 10:20am UTC](https://discuss.elastic.co/t/logstash-upgrade-dilemma/182589/2 "2019-05-24T10:20:25Z")

</div>

Have a look here: [https://www.elastic.co/support/matrix](https://www.elastic.co/support/matrix) in the tab product compatibility

Are you using some plugins that are not included in the 7.1?  
Are you using custom mappings/query templates etc?

---

<div class="post-metadata">

**Author:** ![agiorgi](https://avatars.discourse-cdn.com/v4/letter/a/e274bd/32.png) [@agiorgi](https://discuss.elastic.co/u/agiorgi)\
**Post date:** [May 24, 2019, 10:24am UTC](https://discuss.elastic.co/t/logstash-upgrade-dilemma/182589/3 "2019-05-24T10:24:23Z")

</div>

Hi, thanks for you answer.  
I might have misspoken. I know that Beats and so on, can still send data to logstash even if logstash is at a newer version (e.g. Beats 6.8.x and LS 7.x), thus to give flexibility while scheduling the upgrades.

What i wanted to know is that logstash can be upgraded WITHOUT shutting down the whole pipeline, as specified in [the docs (step 1)](https://www.elastic.co/guide/en/logstash/current/upgrading-using-package-managers.html), if the "service" is balanced with a load balancer.

Is it really necessary to shut down the entire pipeline?

I hope that i've been clearer now

Many thanks,  
Alessandro

---

<div class="post-metadata">

**Author:** ![system](https://us1.discourse-cdn.com/elastic/original/3X/1/a/1ac57faf039f6b580b3f104ef42a2a89e41014de.png) [@system](https://discuss.elastic.co/u/system)\
**Post date:** [June 21, 2019, 10:24am UTC](https://discuss.elastic.co/t/logstash-upgrade-dilemma/182589/4 "2019-06-21T10:24:32Z")

</div>

This topic was automatically closed 28 days after the last reply. New replies are no longer allowed.
