# Rollup a rolled up index

**URL:** https://discuss.elastic.co/t/rollup-a-rolled-up-index/190764
**Category:** Elasticsearch
**Created:** [July 16, 2019, 2:46pm UTC](https://discuss.elastic.co/t/rollup-a-rolled-up-index/190764 "2019-07-16T14:46:19Z")
**Posts on this page:** 2
**Page:** 1

<div class="post-metadata">

### Author: ![mcguacon](https://avatars.discourse-cdn.com/v4/letter/m/958977/32.png) [@mcguacon](https://discuss.elastic.co/u/mcguacon)
#### Post date: [July 16, 2019, 2:46pm UTC](https://discuss.elastic.co/t/rollup-a-rolled-up-index/190764/1 "2019-07-16T14:46:19Z")

</div>

I currently have a rollup job writing to the index **rollup-windows-service** with a 1 hour interval. Using both another rollup and an ILM policy, I want to further roll this data up to a 1 day interval once the data reaches 7 days old.  
Do I actually need to used ILM for this? Or can I just specify another rollup job with a delay of 7 days that points at my already rolled-up index?

---

<div class="post-metadata">

### Author: ![system](https://us1.discourse-cdn.com/elastic/original/3X/1/a/1ac57faf039f6b580b3f104ef42a2a89e41014de.png) [@system](https://discuss.elastic.co/u/system)
#### Post date: [August 13, 2019, 2:55pm UTC](https://discuss.elastic.co/t/rollup-a-rolled-up-index/190764/2 "2019-08-13T14:55:08Z")

</div>

This topic was automatically closed 28 days after the last reply. New replies are no longer allowed.
