# Upgrade path from v 6.8.14 to current 7.11.x

**URL:** <https://discuss.elastic.co/t/upgrade-path-from-v-6-8-14-to-current-7-11-x/265979>\
**Category:** Elasticsearch\
**Created:** [March 2, 2021, 3:58pm UTC](https://discuss.elastic.co/t/upgrade-path-from-v-6-8-14-to-current-7-11-x/265979 "2021-03-02T15:58:43Z")\
**Posts on this page:** 2\
**Page:** 1

<div class="post-metadata">

**Author:** ![acaldwell](https://avatars.discourse-cdn.com/v4/letter/a/258eb7/32.png) [@acaldwell](https://discuss.elastic.co/u/acaldwell)\
**Post date:** [March 2, 2021, 3:58pm UTC](https://discuss.elastic.co/t/upgrade-path-from-v-6-8-14-to-current-7-11-x/265979/1 "2021-03-02T15:58:43Z")

</div>

Hello,

My organization is currently running the elastic stack v6.8.14 and will be upgrading to current 7.11.x in the near future. We are running this on kubernetes and have two clusters - prod and nonprod.

Our nonprod cluster is 9 nodes and about 10.6 TB. The prod cluster is smaller at 6 nodes and 5.5TB.

What I need to know is the best upgrade path to 7.11.x. Is it via ECK 1.4? Or should I continue with standalone images of ES, LS, Kibana, and Filebeats? Are there any resources anyone has on exactly HOW to do this upgrade? I know there are breaking changes between ES 6.8.x and 7.x .

If ECK is the right option, is there a best practice or how to on how to move from standalone apps to the ECK operator?

Finally, ELK management has proven challenging for our team. As yet there is only 1 person who configures and maintains the ELK clusters and he has no backup :(. Would moving to a SaaS type offering here be feasible? 5.5 TB seems cost prohibitive. We have a relationship with MS Azure. I doubt we'd put non-prod into Azure as well, but hey you never know. Management makes crazy decisions.

TIA,  
Andrew

---

<div class="post-metadata">

**Author:** ![system](https://us1.discourse-cdn.com/elastic/original/3X/1/a/1ac57faf039f6b580b3f104ef42a2a89e41014de.png) [@system](https://discuss.elastic.co/u/system)\
**Post date:** [March 30, 2021, 3:59pm UTC](https://discuss.elastic.co/t/upgrade-path-from-v-6-8-14-to-current-7-11-x/265979/2 "2021-03-30T15:59:33Z")

</div>

This topic was automatically closed 28 days after the last reply. New replies are no longer allowed.
