I'm upgrading an existing cluster (v1.3.x to 1.4.x) that has separate master, client and data nodes.
https://www.elastic.co/guide/en/elasticsearch/reference/current/setup-upgrade.html
I know I can do a rolling upgrade, but does the type of node impact the order that I upgrade? For example, should I upgrade all master nodes first?